Tiverton, Ontario N0G 2T0
Situated on Highway 21, the primary north-south arterial connecting Kincardine, Tiverton, and the Bruce Power nuclear generating station, this 19,000 sq ft facility on 19.365 acres represents a rare opportunity to acquire substantial, below-replacement-cost infrastructure with strategic proximity to one of Ontario's largest employers.
Bruce Power has over 8,500 people on site daily and is executing a $20B Life-Extension Program alongside multi-billion-dollar expansions. This facility offers immediate, adaptable infrastructure to support operations, training, or logistics tied to this economic engine.
All photos have been digitally staged with furniture removed. The building will be delivered vacant. The virtual tour shows the building in its current furnished state.
The facility includes a dedicated garage wing with five service bays and secure caged storage areas for equipment, tools, and materials. The garage is designed for fleet vehicle maintenance, equipment storage, and operational staging. The bays provide drive-through access suitable for commercial vehicles and service trucks. A small storage loft is located above the garage area.
All photos have been digitally enhanced with furniture removed. The building will be delivered vacant. Photos are organized by building area following the floor plan layout.












Explore the facility as it currently stands. Please note: the virtual tour shows the building with existing furniture in place. All furniture will be removed prior to sale.

The following table summarizes the annual operating costs for the facility based on the current owner's records.
| Expense Category | Annual Cost |
|---|---|
| Electricity | $111,621.12 |
| Waste Removal | $2,606.40 |
| Property Tax | $54,333.88 |
| Janitorial | $62,400.00 |
| Snow Removal | $22,000.00 |
| Lawn & Grounds | $14,400.00 |
| Water & Sewer | $4,570.86 |
| Total Annual Operating Cost | $271,932.26 |
Quotes received for roof repairs (excluding flat roof). When previous sections were replaced, plywood replacement was not required. The flat roof quote will be provided in spring 2026.
| Roof Section | Base Quote | Optional Plywood |
|---|---|---|
| Front South Wing | $25,018.58 | $13,447.00 |
| Garage | $50,217.64 | $28,476.00 |
| Front Carport Section | $9,261.08 | $4,350.50 |
Note: The flat roof section quote is pending and will be available in spring 2026 once weather conditions allow for a proper assessment.
For more information about this listing or to arrange a private viewing of the facility, please contact the listing agent directly.
Visit LamontGroup.caCEO & Founder, The Lamont Group
eXp Realty Brokerage